How long will it take?

3D photography generally takes longer than still photography. For homes, plan on 45 minutes per 1,000 square feet, plus 15 minutes for set up and planning. A 3,000 square foot home will take approximately 2.5-3 hours to complete.

In commercial/office environments the photography generally takes less time, but is dependent on type of space and level of detail required. As an example, an art gallery would take longer than a space the same size with open offices.